Skip to the tool

Bar chart: Trains arriving late

Pick out the main features of this bar chart for your overview, write your report on a 20-minute timer, then compare it with a band-8 model answer.

WRITING TASK 1

You should spend about 20 minutes on this task.

The chart below shows the percentage of trains arriving late for five rail companies in 2018 and 2023.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Write at least 150 words.

Trains arriving late
Bar chart: Trains arriving late (%). The values are in the data table below.0%5%10%15%20%25%30%NorthlineEastwayCapitalValleyCoastal
  • 2018
  • 2023
Show data table
Trains arriving late
Category20182023
Northline12%8%
Eastway18%22%
Capital9%7%
Valley25%14%
Coastal15%19%

GoPrep wrote this practice question in the style of the exam. It is not an official IELTS question.

What your overview should say

An overview names the main trends or differences in one or two sentences, without numbers. These are the features a strong answer picks out:

  1. 1Overall, punctuality improved at three of the five companies between 2018 and 2023, while two got worse.
  2. 2Valley made the biggest improvement, with late trains falling from 25% to 14%, and Northline went from 12% to 8%.
  3. 3Eastway and Coastal deteriorated to 22% and 19%, so Eastway was the least punctual company in 2023.

Write it on the clock

Spend the first few minutes planning, then write.

20:00

0 words of 150 minimum

Your answer stays on this page only. Copy it before you leave.

Band-8 model answer

Write your own answer first, then compare: how it answers the exact question, what each paragraph does, and which phrases you could borrow.

Show model answer (175 words)

The bar chart compares the percentage of trains that arrived late for five rail companies in 2018 and 2023.

Overall, punctuality improved for three of the five companies and worsened for the other two. Capital was the most punctual company in both years, while the biggest improvement was recorded by Valley.

In 2018 Valley had the worst record, with 25% of its trains arriving late, followed by Eastway at 18%, Coastal at 15% and Northline at 12%. Capital performed best, with only 9% of trains late. By 2023 Valley's figure had dropped to 14%, a fall of 11 percentage points, which meant it was no longer the worst performer.

Northline and Capital also improved, although by smaller margins. Northline fell from 12% to 8%, and Capital from 9% to 7%.

The remaining companies moved in the opposite direction. Eastway's rate of late trains rose from 18% to 22%, making it the least punctual company in 2023, and Coastal's increased from 15% to 19%. Both of these companies therefore saw a rise of 4 percentage points.

Useful vocabulary

PhraseMeaning
punctualityarriving on time
arrive latereach a destination after the scheduled time
improveget better
deteriorateget worse
the biggest improvementthe largest positive change
the least punctualthe one most often late

Getting ready for IELTS?

All free tools

Speaking topic generator

Answer random Part 1, 2 and 3 questions on an exam timer.

IELTS band score calculator

Average your four skill bands, rounded the way IELTS rounds them.

IELTS score converter

Compare an IELTS band with TOEFL, Duolingo and PTE scores and CEFR levels.

University IELTS requirements

Look up the IELTS score a university asks for, with the source.