Langsung ke alat

Process diagram: Cement production

Pilih fitur utama process diagram ini untuk overview-mu, tulis laporanmu dengan timer 20 menit, lalu bandingkan dengan contoh jawaban band 8.

WRITING TASK 1

You should spend about 20 minutes on this task.

The diagram below shows how cement is manufactured.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Write at least 150 words.

Cement production
  1. 1QuarryingLimestone and clay are dug from a quarry
  2. 2CrushingRock is broken into small pieces
  3. 3GrindingMaterials are ground into a fine powder
  4. 4BlendingThe powder is mixed in the correct proportions
  5. 5PreheatingRaw mix is heated in a tower
  6. 6Kiln heatingIt is burned at 1,450°C in a rotating kiln
  7. 7CoolingHard lumps called clinker are cooled
  8. 8Adding gypsumClinker is ground with gypsum
  9. 9PackingCement is stored and bagged for delivery

Soal latihan ini ditulis oleh GoPrep dengan gaya ujian. Ini bukan soal resmi IELTS.

Apa yang perlu ada di overview

Overview menyebut tren atau perbedaan utama dalam satu atau dua kalimat, tanpa angka. Inilah fitur yang diangkat oleh jawaban yang kuat:

  1. 1Overall, cement production is a linear process of nine stages, starting with quarrying raw materials and ending with packaging the finished cement.
  2. 2First, limestone and clay are quarried, crushed, ground into a powder and blended.
  3. 3The mixture is then preheated and burned in a kiln at 1,450°C, and the resulting clinker is cooled, ground with gypsum and packed.

Tulis dengan batas waktu

Gunakan beberapa menit pertama untuk membuat rencana, lalu mulai menulis.

20:00

0 kata dari minimal 150

Jawabanmu hanya ada di halaman ini. Salin sebelum kamu meninggalkannya.

Contoh jawaban band 8

Tulis jawabanmu sendiri dulu, lalu bandingkan: bagaimana contoh ini menjawab soal yang persis sama, apa fungsi setiap paragraf, dan frasa mana yang bisa kamu pakai.

Tampilkan contoh jawaban (175 kata)

The diagram illustrates the nine stages involved in the manufacture of cement.

Overall, the process is linear. Raw materials are first dug up and ground into a powder, then heated at very high temperature, and the product is finally ground again and packed for delivery. The first four stages prepare the raw materials, the next three involve heating and cooling, and the last two complete the product.

The process starts with quarrying, when limestone and clay are dug from a quarry. The rock is then crushed so that it is broken into small pieces, and the materials are ground into a fine powder. Next, the powder is blended, or mixed in the correct proportions.

In the middle stages, the raw mix is heated in a tower, which is known as preheating. It is then burned at 1,450°C in a rotating kiln. The hard lumps that result, called clinker, are cooled.

In the last two stages, the clinker is ground with gypsum, and the finished cement is stored and bagged for delivery, which completes the process.

Kosakata berguna

FrasaArti
quarrydig stone from the ground
be ground into powderbe crushed finely
rotary kilna large rotating oven
clinkerhard lumps produced in a kiln
add gypsummix in a mineral that controls setting
be packed for deliverybe bagged for transport

Sedang bersiap untuk IELTS?

Semua alat gratis

Generator topik Speaking

Jawab pertanyaan acak Part 1, 2, dan 3 dengan timer ujian.

Kalkulator band score IELTS

Rata-rata band dari empat skill, dibulatkan dengan cara IELTS membulatkannya.

Konverter skor IELTS

Bandingkan band IELTS dengan skor TOEFL, Duolingo, dan PTE serta level CEFR.

Syarat IELTS universitas

Cari skor IELTS yang diminta universitas, lengkap dengan sumbernya.