Cement production
  1. 1QuarryingLimestone and clay are dug from a quarry
  2. 2CrushingRock is broken into small pieces
  3. 3GrindingMaterials are ground into a fine powder
  4. 4BlendingThe powder is mixed in the correct proportions
  5. 5PreheatingRaw mix is heated in a tower
  6. 6Kiln heatingIt is burned at 1,450°C in a rotating kiln
  7. 7CoolingHard lumps called clinker are cooled
  8. 8Adding gypsumClinker is ground with gypsum
  9. 9PackingCement is stored and bagged for delivery

Bu mashq savolini GoPrep imtihon uslubida yozgan. U rasmiy IELTS savoli emas.

Overview’da nima deyish kerak

Overview asosiy tendensiyalar yoki farqlarni bir-ikki gapda, raqamlarsiz aytadi. Kuchli javob ajratib ko‘rsatadigan jihatlar quyidagilar:

  1. 1Overall, cement production is a linear process of nine stages, starting with quarrying raw materials and ending with packaging the finished cement.
  2. 2First, limestone and clay are quarried, crushed, ground into a powder and blended.
  3. 3The mixture is then preheated and burned in a kiln at 1,450°C, and the resulting clinker is cooled, ground with gypsum and packed.

Vaqtga qarab yozing

Dastlabki bir necha daqiqada reja tuzing, keyin yozing.

20:00

0 so‘z (kamida 150)

Javobingiz faqat shu sahifada qoladi. Sahifadan chiqishdan oldin uni nusxalab oling.

Band 8 namunaviy javob

Avval o‘z javobingizni yozing, keyin solishtiring: namuna aynan shu savolga qanday javob beradi, har bir xatboshi qanday vazifani bajaradi va qaysi iboralarni o‘zingizga olishingiz mumkin.

Namunaviy javobni ko‘rsatish (175 so‘z)

The diagram illustrates the nine stages involved in the manufacture of cement.

Overall, the process is linear. Raw materials are first dug up and ground into a powder, then heated at very high temperature, and the product is finally ground again and packed for delivery. The first four stages prepare the raw materials, the next three involve heating and cooling, and the last two complete the product.

The process starts with quarrying, when limestone and clay are dug from a quarry. The rock is then crushed so that it is broken into small pieces, and the materials are ground into a fine powder. Next, the powder is blended, or mixed in the correct proportions.

In the middle stages, the raw mix is heated in a tower, which is known as preheating. It is then burned at 1,450°C in a rotating kiln. The hard lumps that result, called clinker, are cooled.

In the last two stages, the clinker is ground with gypsum, and the finished cement is stored and bagged for delivery, which completes the process.

Foydali lug‘at

IboraMa’nosi
quarrydig stone from the ground
be ground into powderbe crushed finely
rotary kilna large rotating oven
clinkerhard lumps produced in a kiln
add gypsummix in a mineral that controls setting
be packed for deliverybe bagged for transport

IELTS ga tayyorlanyapsizmi?

Barcha bepul vositalar

Speaking mavzulari generatori

Imtihon taymeri bilan tasodifiy Part 1, 2 va 3 savollariga javob bering.

IELTS umumiy ball kalkulyatori

To‘rt ko‘nikma balining o‘rtachasi, IELTS qanday yaxlitlasa, shunday yaxlitlangan.

IELTS ball konvertori

IELTS balini TOEFL, Duolingo va PTE ballari hamda CEFR darajalari bilan solishtiring.

Universitetlarning IELTS talablari

Universitet so‘raydigan IELTS balini manbasi bilan toping.